نتایج جستجو برای: commissioning beam
تعداد نتایج: 116791 فیلتر نتایج به سال:
The Spallation Neutron Source accelerator systems are designed to deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an Hinjector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current; a 1 GeV linear accelerator; an accumulator ring; and associated transport lines. The accelera...
The use of modeling programs for accelerator beamline control and commissioning is becoming an accepted practice. For control applications, the goal in using these programs is to correct deviations in the beam measurements or to change the machine parameters. Since these programs are used for operation of the machine, they are a part of the on-line control system. For commissioning, the goal is...
At National Institute of Radiological Sciences (NIRS), more than 6500 patients have been successfully treated by carbon-ion beams since 1994. The successful results of treatments have led us to construct a new treatment facility equipped with three-dimensional pencil beam scanning irradiation system. The commissioning of NIRS fast scanning system installed into the new facility was started in S...
After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established two linac injection modes for the KEKB ring: an 8-GeV electron beam and a 3.5-GeV positron beam, as well as beam modes for the rings of the synchrotron light sources. All modes are easily switched for almost one minute without any trouble. The linac beam characteristics have been substantially i...
This paper illustrates the need for validating the calculation of monitor units as part of the process of commissioning a photon beam model in a radiation treatment planning system. Examples are provided in which this validation identified subtle errors, either in the dose model or in the implementation of the dose algorithm. These errors would not have been detected if the commissioning proces...
The ATLAS detector is one of the experiments at the LHC that will detect high-energy proton collisions at 14 TeV. The commissioning of the detector has started already in 2005 in parallel to the detector installation and is still in progress. The data taken so far corresponds to noise runs, cosmic muon events and beam background events from single beam in September 2008. We present the current ...
Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation, (3) test of beam based alignment.
The neutral beam injection (NBI) system is designed to provide the ion heating and current drive for the high performance operation and long pulse operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The KSTAR NBI consists of two beam lines. Each beam line contains three ion sources of which one ion source has been designed to deliver more than 2.5 MW of deuterium neutral ...
The MedAustron accelerator (Wiener Neustadt, Austria) will deliver clinical beams of protons (60 250 MeV) and carbon ions (120 400 MeV/n) to three ion beam therapy irradiation rooms (IR). Clinical beams and proton beams up to 800 MeV will be provided in a fourth IR, dedicated to non-clinical research. A slow-extracted proton beam of maximum clinical energy reached for the first time the IR3 in ...
The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) consists of a turn key 100 MeV linac, a novel type of booster synchrotron and a 12-TBA storage ring providing 5 nm·rad natural emittance at 2.4 GeV. The SLS project was approved by Swiss Government in Sept. 1997. By June 1999 the building was finished. Linac and booster commissioning concluded by April, resp. Sept. 2000. First be...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید