نتایج جستجو برای: کیت surveyor
تعداد نتایج: 3133 فیلتر نتایج به سال:
conclusions the dimensions and variables affecting the surveyors’ management were identified and classified on the basis of existing scientific methods in the form of a conceptual framework. using the results of this study, it would certainly be possible to take a great step toward enhancing the reliability of surveys and the quality and safety of services, while effectively managing accreditat...
Assimilation of TES data from the Mars Global Surveyor scientifc mapping phase Conference Item How to cite: Montabone, L.; Lewis, Stephen R.; Read, Peter L.; Conrath, Barney J.; Pearl, John C. and Smith, Michael D. (2003). Assimilation of TES data from the Mars Global Surveyor scientifc mapping phase. In: First International Workshop on Mars atmosphere modelling and observations, 13-15 Jan 2003...
BACKGROUND The surveyors in hospital accreditation program are considered as the core of accreditation programs. So, the reliability and validity of the accreditation program heavily depend on their performance. OBJECTIVES This study aimed to identify the dimensions and factors affecting surveyor management of hospital accreditation programs in Iran. MATERIALS AND METHODS This qualitative s...
This paper describes an extension of C Global Surveyor (CGS), a static program analysis tool developed at the NASA Ames Research Center. CGS is used to analyse mission-critical flight software of NASA Mars missions. In order to enhance CGS and support the analysis of very large systems, the abstract interpretation techniques on which CGS is based need to be augmented by complimentary program an...
The Rapid Transient Surveyor (RTS) is a proposed rapid-response, high-cadence adaptive optics (AO) facility for the UH 2.2-m telescope on Maunakea. RTS will uniquely address the need for high-acuity and sensitive near-infrared spectral follow-up observations of tens of thousands of objects in mere months by combining an excellent observing site, unmatched robotic observational efficiency, and a...
Building conservation work generally involves complex and non-standard work different from new building construction processes. In preparing tenders for building conservation projects, therefore, the quantity surveyor must carefully consider the specificity of non-standard items and demarcate the scope of unique conservation work. While the quantity surveyor must appreciate the full range of wo...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید