نتایج جستجو برای: setup times

تعداد نتایج: 374647  

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

Journal: :journal of industrial engineering, international 2011
a.m kimiagari h mosadegh

in this paper, the researchers have investigated a concatenated robot move (crm) sequence problem and minimal part set (mps) schedule problem with different setup times for two-machine robotic cell. they have focused on simultaneous solving of crm sequence and mps schedule problems with different loading and unloading times. they have applied a simulated annealing (sa) algorithm to provide a go...

Journal: :Mathematics 2023

As multi-factory production models are more widespread in modern manufacturing systems, a distributed blocking flowshop scheduling problem (DBFSP) is studied which no buffer between adjacent machines and setup time constraints considered. To address the above problem, mixed integer linear programming (MILP) model first constructed, its correctness verified. Then, an iterated greedy-algorithm-bl...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید