The work presented in this article generalizes the modeling of task scheduling problems with sequence dependent setup time on the basis of task scheduling on single respectively exclusive resources: Besides working activities also work breaks are respected properly which is formally proven. The additional contribution of this article is an effective pruning algorithm according to the presented ...

Journal: :IFAC-PapersOnLine 2021

In this study, we consider a particular version of the hybrid flexible flow shop (HFFS) scheduling problem, inspired from real-life application in printing industry. The considered problem is variation classical Flow which specific constraints are jointly considered, such as non-identical parallel machines, sequence-dependent setups on machine eligibility, and precedence among jobs, order to mi...

Journal: :International Journal of Industrial Engineering Computations 2021

This paper deals with the problem of scheduling jobs in a parallel flow shop environment without buffers between machines and sequence-dependent setup times order to minimize maximum completion time jobs. The blocking constraint normally leads an increase due blockage machines, which can even more so when are considerable. Hence, heuristic solve this must take into account these specificities t...

Journal: :Journal of the Korean Operations Research and Management Science Society 2014

This paper presents a new mathematical programming model for an integrated production and air transportation in supply chain management with sequence-dependent setup times in order to design an applied procedure for the production and distribution schedule. The aim of this model is to minimize the total supply chain cost consisting of the costs of distribution, production earliness and tardines...

This paper presents a new mathematical programming model for an integrated production and air transportation in supply chain management with sequence-dependent setup times in order to design an applied procedure for the production and distribution schedule. The aim of this model is to minimize the total supply chain cost consisting of the costs of distribution, production earliness and tardines...

Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...

2005
Rubén Ruiz Thomas Stützle

The flowshop problem (FSP) is one of the most thoroughly studied scheduling problems. In the FSP, a set N = {1, . . . , n} of n independent jobs has to be processed on a set M = {1, . . . ,m} of m machines. Every job j, j ∈ N , requires a given fixed, non-negative processing time pij on every machine i, i ∈ M . In a flowshop, all n jobs are to be processed on the m machines in the same order, t...