in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...
although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. but, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. this paper considers the problem of scheduling no-idle hybrid flow shops. a mixed integer linear programming model is first developed to mathematically form...
This paper addresses the multistage hybrid flow shop (HFS) scheduling problems. The HFS is the special case of flowshop problem. Multiple parallel machines are considered in each stage in the HFS. The HFS scheduling problem is known to be strongly NPhard. Hence, many researchers proposed metaheuristic algorithms for solving the HFS scheduling problems. This paper develops a bat algorithm (BA) t...
The assumption of classical shop scheduling problems that each job visits each machine only once (Baker, 1974) is often violated in practice. A new type of manufacturing shop, the reentrant shop has recently attracted attention. The basic characteristic of a re-entrant shop is that a job visits certain machines more than once. For example, in semiconductor manufacturing, consequently, each wafe...
A flexible flow shop problem can be considered as a generalization of a pure flow shop problem in which the jobs have to go through the stages in the same order. We consider a flexible flow shop problem with unrelated machines and setup times, where the processing times depend on the chosen machine and setup times are sequence-dependent. While for classical problems the processing times for eac...
This paper addresses the Hybrid Flow Shop (HFS) scheduling problems to minimize the total work-in-process inventory. Job scheduling problems are one of the oldest and real world combinational optimization problems. It is multi objective and complex in nature. There exist some criteria that must be taken into consideration when evaluating the quality of the proposed schedule. Consideration of jo...
This paper considers the problem of scheduling n jobs in the generalized tardiness flow shop problem with m machines. Seven algorithms are developed for finding a schedule with minimum total tardiness of jobs in the generalized flow shop problem. Two simple rules, the shortest processing time (SPT), and the earliest due date (EDD) sequencing rules, are modified and employed as the core of seque...