Mitchell L. Neilsen

Windows TM Dam Analysis Modules (WinDAM) is a set of modular software components that can be used to analyze overtopped earthen embankments and internal erosion of embankment dams. These software components are being developed in stages. The initial computational modules address routing of floods through the reservoir with dam overtopping and evaluation of the potential for vegetation or riprap...

2014
Mitchell L. Neilsen

Windows TM Dam Analysis Modules (WinDAM) is a set of modular software components that can be used to analyze overtopped earthen embankments and internal erosion of embankment dams. These software components are being developed in stages. The initial computational modules address routing of floods through the reservoir with dam overtopping and evaluation of the potential for vegetation or riprap...

2013
Qi Liu Shiliang Liu Haidi Zhao Li Deng Cong Wang Qinghe Zhao Shikui Dong

Dam construction causes the accumulation of phosphorus in the sediments of reservoirs and increases the release rate of internal phosphorus (P) loading. This study investigated the longitudinal variability of phosphorus fractions in sediments and the relationship between the contents of phosphorus fractions and its influencing factors of the Manwan Reservoir, Lancang River, Yunnan Province, Chi...

2010
Terry L. Anderson Donald R. Leal

When I was elected governor in 1974, the West had a well-established water system. . . . Bureau [of Reclamation] officials and local irrigation districts selected reservoir sites and determined water availability. With members of the western congressional delegation, they obtained project authorization and funding. Governors supported proposals, appearing before congressional committees to requ...

Due to the immense damage caused by dam failure, especially dams constructed near large cities, it is necessary to consider the breaking phenomena as well as studying and designing different parts of the dam. For this purpose, the hydrograph of the outflow due to dam failure must be identified according to size of the fracture and then flood routing, and flood zone must be determined based on t...

2002
A. Marcano C. Castro E. Martinez

Caruachi Hydroelectric Project conforms together with Guri, Tocoma and, Macagua the Lower Caroni Hydroelectric Development. Second Stage of River Diversion at Caruachi included diverting the Caroni River through 18, 5.5 × 9m sluices in the spillway lower body that after being closed by gates permitted the reservoir filling. In order to define the precise timing for closure of the sluices and to...

2016
Radenko Pejović Radivoje Mrdak

Original scientific paper This paper analyses the seismic strength of the high arch concrete dam of the Hydro-power plant "Piva" on the river Piva in Montenegro, which was built in the seismic active area almost forty years ago. This is the double curve concrete arch dam, 220 m high and it belongs to the group of very high dams, among the highest 25 in the world. Linear and nonlinear analysis w...

2014
Fugang Xu Hongwei Zhou Jiawen Zhou Xingguo Yang

Once a landslide dam bursts, its reservoir discharges quickly in a flood which will cause catastrophic damage to life and property downstream. For a specific landslide dam, the peak flow rate and the evolution of downstream flood are influenced by the shape and size of the dike breach when dam-break occurs. According to the general nature of landslide dams and field observations of dike-breach ...

Journal: :Environmental pollution 2009
Xinbin Feng Hongmei Jiang Guangle Qiu Haiyu Yan Guanghui Li Zhonggen Li

The geochemical processes of mercury in Dongfeng (DF) and Wujiangdu (WJD) reservoirs, which were constructed in 1992 and 1979, respectively in Wujiang River, which is the upper branch of Yangtze River were investigated. One sampling site was chosen up river of 1 km from the dam for each reservoir. Three sampling campaigns were conducted at these sampling sites in December 2003, April 2004 and J...

2016
Neil M. Coleman Uldis Kaktins Stephanie Wojno

In 1891 a report was published by an ASCE committee to investigate the cause of the Johnstown flood of 1889. They concluded that changes made to the dam by the South Fork Fishing and Hunting Club did not cause the disaster because the embankment would have been overflowed and breached if the changes were not made. We dispute that conclusion based on hydraulic analyses of the dam as originally b...

نمودار تعداد نتایج جستجو در هر سال