This paper addresses minimizing Total Weighted Earliness/Tardiness (TWET) of jobs in a Flexible Job Shop (FJS) problem. The FJS problem is an extension of the classical Job Shop (JS) problem that implies each operation may be assigned to alternative available machines. So, a job may have alternative routing. The FJS problem with a TWET criterion is modeled as a mixed integer programming. The mo...
In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...
This research deals with a hybrid flow shop scheduling problem with parallel batching, machine eligibility, unrelated parallel machine, and different release dates to minimize the sum of the total weighted earliness and tardiness (ET) penalties. In parallel batching situation, it is supposed that number of machine in some stages are able to perform a certain number of jobs simultaneously. First...
In this paper we address a multi-objective scheduling problem for unrelated parallel machines. In unrelated parallel systems, the processing cost/time of a given job on different machines may vary. The objective of scheduling is to simultaneously determine the job-machine assignment and job sequencing on each machine. In such a way the total cost of the schedule is minimized. The cost function ...
In this paper, it is investigated how to sequence jobs with fuzzy processing times and predict their due dates on a single machine such that the total weighted possibilistic mean value of the weighted earliness–tardiness costs is minimized. First, an optimal polynomial time algorithm is put forward for the scheduling problem when there are no precedence constraints among jobs. Moreover, it is s...
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...
Early-Tardy Minimization for Joint Scheduling of Jobs and Maintenance Operations on a Single Machine
In this paper, we consider joint scheduling of jobs and preventive maintenance operations on a single machine with an objective to minimize the total earliness and tardiness of jobs about a common due date. The properties of an optimal schedule are identified and utilized to develop a constructive heuristic and a lower bound estimate. The properties are also utilized to hybridize Tabu search a...