نتایج جستجو برای: mode project scheduling

تعداد نتایج: 527678  

2013
Leonardo M. Borba Alexander J. Benavides Tadeu Zubaran Germano M. Carniel

In the multi-mode resource-constrained multi-project scheduling (MMRCMPSP) problem we have to find execution modes and starting times for the jobs of multiple projects, such that the total project delay is minimized. The delay of a project is the difference between its makespan and a lower bound on its duration. A secondary objective is to minimize the total makespan of all projects. The jobs o...

Journal: :European Journal of Operational Research 2000
Gündüz Ulusoy Serkan Cebelli

This study reports on a new approach to the payment scheduling problem. In this approach, the amount and timing of the payments made by the client and received by the contractor are determined so as to achieve an equitable solution. An equitable solution is defined as one where both the contractor and the client deviate from their respective ideal solutions by an equal percentage. The ideal sol...

Journal: :International Journal of Computer Applications 2012

Journal: :CoRR 2013
Martin Josef Geiger

The resource constrained multi-mode multi-project scheduling problem (RCMMMPSP) is a notoriously difficult combinatorial optimization problem. For a given set of activities, feasible execution mode assignments and execution starting times must be found such that some optimization function, e. g. the makespan, is optimized. When determining an optimal (or at least feasible) assignment of decisio...

Journal: :iranian journal of management studies 2015
emad roghanian fatemeh mojibian

risk management is one of the most important phases of project management and isthe most recently used by many researchers. in this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy fmea a...

Journal: :مهندسی صنایع 0
عرفان مهمانچی مهندسی صنایع- دانشگاه صنعتی شریف شهرام شادرخ دانشکده مهندسی صنایع- دانشگاه صنعتی شریف

the allocation of human resources to project activities in order to schedule them is one of the closest states to the actual conditions of scheduling problems. but regarding the fact that this problem belongs to the class of np-hard problems; so far the exact methods have only been able to solve the small size problems. in this study, the renewable resources are humans in a way that every staff...

2002
F. Griffith

odern project scheduling techniques have been around for almost 50 years. The original development work on the critical path method (CPM) and the performance evaluation and review technique (PERT) began in the mid 1950s [6]&[7]. Although the basic principles behind CPM and PERT have not changed, significant advances in project scheduling have taken place in the years since these techniques were...

2014
Marcin RELICH Krzysztof WITKOWSKI Sebastian SANIUK Jana ŠUJANOVÁ

Decision-making supported by task-oriented software tools plays more and more role in the production companies, including metallurgical plants. Decision-making in production planning and scheduling requires the response in an interactive real-time mode. It is an incentive for developing decision support system (DSS) that enables a fast prototyping of production flows in multi-project environmen...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه تهران - دانشکده فنی 1387

چکیده ندارد.

2015
Madhukar Dayal Sanjay Verma

The multi-mode resource-constrained project scheduling problem (MM RCPSP) is an NP-hard problem representing a generalization of the well-studied RCPSP. Depth-first tree search approach by Sprecher & Drexl (1998) is the best-known exact solution tree search procedure for this problem. In this paper we modify an existing breadth-first algorithm for multiple processors. It is a computer-cluster i...