The main canal of the middle route South-to-North Water Diversion Project has risk excess head loss in crossing water-conveyance structures, but assessment this faces difficulties such as lack sufficient monitoring points inside current flow rate being lower than design maximum rate, and verification data. Monitoring data were collected 2022, prototype observations carried out, verified, a meth...