نتایج جستجو برای: open pit mine production scheduling
تعداد نتایج: 1070868 فیلتر نتایج به سال:
In the case of Roşia Poieni open pit mine level +805 m was established as a daily operating limit; division into benches based on this by dividing horizontal slices with thickness 15 m, equal to height bench. Thus, there were 27 in Curmătura area and 23 Ruginiş area. The general slope angle set at 35°, for which tailings volumes implicitly opening-up coefficient calculated. stability analysis p...
Here we report on a metagenomics investigation of the microbial diversity in a serpentine-hosted aquatic habitat created by chrysotile asbestos mining activity at the Vermont Asbestos Group (VAG) Mine in northern Vermont, USA. The now-abandoned VAG Mine on Belvidere Mountain in the towns of Eden and Lowell includes three open-pit quarries, a flooded pit, mill buildings, roads, and > 26 million ...
To effectively manage the stability of in-pit dumps with an underlying weak layer, a new plan for treatment staged floor during life mine was proposed in this study. Based on direct shear test results, properties contact surfaces between dumped spoil, and mudstone were determined. Taking Baiyinhua No.1 Open-pit Mine as example, surface spoil determined its cohesion to be 25.78 kPa, internal fri...
This study aims to fully explore the influence of rock joint roughness in slope stability analysis an open mine. Therefore, based on least squares parameter estimation method, a generalized shear strength coupling roughness, which is used evaluate design, was established by matching formula reflecting relationship between coefficient and parameter. Firstly, verify calibrate model, physical dire...
This study was conducted in Mouteh grinding circuit. Mouteh gold processing plant is located in Esfahan province,center of Iran, close to Mouteh open pit mine. One of the main problems in this circuit is low efficiency grinding operation. In this study, first grinding circuit and its performance parameters are evaluated. Laboratory and corrected operating Bond work index subsequently were calcu...
This work tackles the open pit planning problem in an optimal control framework. We study optimality conditions for so-called continuous formulation using Pontryagin’s Maximum Principle, and introduce a new, semi-continuous that can handle optimization of two-dimensional mine profile. Numerical simulations are provided several test cases, including global one-dimensional final pit, first result...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید