Journal: :The Journal of the Operational Research Society 1999

Journal: :European Journal of Operational Research 2005
Willy Herroelen Roel Leus

The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, which is gradually resolved during project execution. In this survey w...

1997
Arno Sprecher

We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multi-mode problems, resource availability varying with time, and a wide range of objectives. Even the simple assembly line balancing...

2014
Shangyao Yan

Project scheduling is essential in enterprise operations. Not only does it increase working efficiency but also the enterprise’s profit. In the past, there have been studies developing heuristic algorithms to efficiently solve the complicated multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF). These obtained solutions are approximate rather than op...

2014
Omar S. Soliman

: This paper proposes a novel niching estimation of distribution algorithm (EDA) based on fuzzy c-means (FCM) clustering for solving the multi-mode resource-constrained project scheduling problem (MRCPSP). FCM clustering is employed to partition the population into niches to avoid premature convergence of the EDA. Then, the niche capacity is determined by Boltzmann scheme according to the adapt...

Hemat, E., Sivakumar, M.V.N. ,

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

2007
Y. KADROU

The scheduling problem under study may be viewed as an extension of the standard Multi-mode ResourceConstrained Project Scheduling Problem (MRCPSP) including Multi-Skilled Labor and will be called as MRCPSP-MS. This problem requires an integration of resource limitation, labor skills, and multiple possible execution modes for each task, and the objective is to minimize the overall project durat...

Journal: :The International Conference on Applied Mechanics and Mechanical Engineering 1984

2011
F. S. Kazemi

This paper presents a multi-objective multi-mode resource-constrained project scheduling problem (MRCPSP) with positive and negative cash flows. We consider the objectives of the net present value (NPV) maximization and robustness maximization along by makespan minimization. Furthermore, to make a model close to the real world situations, two types of commonly used payment models are considered...

Journal: :International Journal of Computer Applications 2014