Amin-Tahmasbi, Tavakkoli-Moghaddam,

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

Hany Seidgar Rasoul Shafaei Sahar Tadayoni Rad, Saiedeh Gholami

This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

2014
Wen-Chiung Lee Yau-Ren Shiau Yu-Hsiang Chung Lawson Ding

We consider a single-machine two-agent problem where the objective is to minimize a weighted combination of the total completion time and the total tardiness of jobs from the first agent given that no tardy jobs are allowed for the second agent. A branch-and-bound algorithm is developed to derive the optimal sequence and two simulated annealing heuristic algorithms are proposed to search for th...

Journal: :iranian journal of operations research 0
m.b. fakhrzad yazd,pejoohesh street,hidusterial eng. leila emami yazd,pejoohesh street,hidusterial eng.

this paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. for solving this multi-objective model, we develop a fuzzy multi-objective linear programming (fmolp) model. in this problem, a proposed fmolp method is applied with respect to the o...

Journal: :journal of optimization in industrial engineering 2014
zahra sadat hosseini javad hassan pour emad roghanian

in this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the p-mmrcpsp while due dates are included i...

2000
Daniel Merkle Martin Middendorf

Ant Colony Optimization is an evolutionary method that has recently been applied to scheduling problems. We propose an ACO algorithm for the Single Machine Total Weighted Tardiness Problem. Compared to an existing ACO algorithm for the unweighted Total Tar-diness Problem our algorithm has several improvements. The main novelty is that in our algorithm the ants are guided on their way to good so...

This paper presents a bi-objective MIP model for the flexible flow shop scheduling  problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...

Journal: :European Journal of Operational Research 2002
Peter Borm M. Gloria Fiestras-Janeiro Herbert Hamers Estela Sánchez-Rodríguez Mark Voorneveld

This paper considers sequencing situations with due date criteria. Three di erent types of criteria are considered: the weighted penalty criterion, the weighted tardiness criterion and the completion time criterion. The main focus is on convexity of the associated cooperative games.

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...