Journal: :Journal of Industrial and Management Optimization 2023

This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...

Journal: :Journal of Rehabilitation and Assistive Technologies Engineering 2018

Journal: :Journal of the Brazilian Society of Mechanical Sciences and Engineering 2013

Bahman Naderi mostafa Zandieh Seyed Mohammad Taghi Fatemi Ghomi

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

2015
Xiao-Yuan Wang Jian-Jun Wang

In this paper we consider the single-machine setup times scheduling with general effects of deterioration and learning. By the general effects of deterioration and learning, we mean that the actual job processing time is a general function of the processing times of the jobs already processed and its scheduled position. The setup times are proportional to the length of the already processed job...

Journal: :Computers & Industrial Engineering 2013
Yiwei Jiang Jianming Dong Min Ji

This paper addresses a preemptive scheduling problem on two parallel machines with a single server. Each job has to be loaded (setup) by the server before being processed on the machines. The preemption is allowed in this paper. The goal is to minimize the makespan. We first show that it is no of use to preempt the job during its setup time. Namely, every optimal preemptive schedule can be conv...

1995
J.M.J. Schutten S. L. van de Velde

We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers’ satis...