A single machine scheduling problem is described which covers earliness costs, tardiness costs and setup costs. Setups are needed whenever a switch is made to a job of another product family. All jobs within the same product family have the same processing time. Besides setup costs also setup times are involved. Idle time is allowed, preemption is not allowed. Both a mixed integer programming f...
The main objective of the working paper series of the IIMA is to help faculty members to test out their research findings at the pre-publication stage. Abstract We address the permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries follow flowshop type of production process. There are...
We study a problem of scheduling a maintenance activity on a single machine. Following several recent papers, the maintenance is assumed to be deteriorating, that is, delaying the maintenance increases the time required to perform it. The following objective functions are considered: makespan, flowtime, maximum lateness, total earliness, tardiness and due-date cost, and number of tardy jobs. We...
In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows s...
In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job’s processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuris...
In the present work, an industrial case study has been considered for multi-objective flow shop scheduling problem including the sequence dependent set up time. The multi-objectives include the minimization of sum of total weighted squared tardiness, total weighted squared earliness, makespan and number of tardy jobs. Industries can select the optimal sequence with respect to required objective...
We address the problem of determining schedules for static, single-machine scheduling problems where the objective is to minimize the sum of weighted tardiness and weighted earliness. We develop optimal and heuristic procedures for the special case of weights that are proportional to the processing times of the respective jobs. The optimal procedure uses dominance properties to reduce the numbe...
This paper considers Just-In-Time Job-Shop Scheduling, in which each activity has an earliness and a tardiness cost with respect to a due date. It proposes a constraint programming approach, which includes a novel filtering algorithm and dedicated heuristics. The filtering algorithm uses a machine relaxation to produce a lower bound that can be obtained by solving a Just-In-Time Pert problem. I...
This paper considers a scheduling problem for minimizing the sum of the absolute deviations of completion times from the due dates of all jobs (earliness-tardiness) on a single batch processing machine. For this problem, each job has a corresponding processing time and size and all jobs have the common due date. The problem under study is NP-hard and hence a hybrid genetic algorithm based on a ...