Journal: :J. Scheduling 2015
Frans Schalekamp René Sitters Suzanne van der Ster Leen Stougie Victor Verdugo Anke van Zuylen

We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machineand s...

2012
Mathias Coqblin Dominique Gendreau Philippe Lutz Jean-Marc Nicod Veronika Rehn-Sonigo

In this paper we consider microfactories for manipulation and assembly. These microfactories are composed of several cells containing microrobotic systems capable of a high level of repeatability. The assembly plan of the production is a pipeline of tasks that are performed by the cells. Our aim is to manage the production flow in the case where the cells can be reconfigured to perform differen...

Nadia Bhuiyan Shahram Sharifi Stayaveer.S. Chauhan

This paper presents the idea of creating cells while reducing part-level sequence-dependent setup time in general cellular manufacturing systems (CMS). Setup time reduction in CMS has gained modest attention in the literature. This could be attributed to the fact that the fundamental problem in cell formation in CMS has been mainly related to material handling and machine utilization while setu...

2016
M. K. Marichelvam K. Manivannan M. Geetha

In this paper, single machine scheduling problems with sequence dependent setup times are considered. The objective is to minimize the total weighted tardiness. The single machine total weighted tardiness (SMTWT) scheduling problems with sequence dependent setup times were proved to be strongly NP-hard. A recently developed meta-heuristic algorithm called as crow search algorithm is proposed to...

Journal: :J. Math. Model. Algorithms 2013
Emna Dhouib Jacques Teghem Taïcir Loukil

This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematic...