Krueng Jambo Balee River, which is a tributary in Aye river basin, flows through the Pertagas pipeline installation (RoW, right of way), at segment Sta. 8+500 to 8+600. Flooding that occurred RoW was caused by draining capacity existing culverts were unsufficient flow discharge from upstream river, thus inundating surrounding area, and overtopping on RoW. This condition serious problem for secu...