نتایج جستجو برای: scheduling models are introduced
تعداد نتایج: 5596718 فیلتر نتایج به سال:
The recently introduced Response Time Variability Problem (RTVP) is a scheduling problem that has a broad range of real-life applications, for example, to sequence the models to be produced on a mixed-model assembly line. Previous studies include heuristic algorithms and mathematical programming models, whose practical limit for obtaining optimal solutions is around 40 units to be scheduled. In...
This paper presents a decision making approach for mid-term scheduling of large industrial consumers based on the recently introduced class of Stochastic Dominance (SD)- constrained stochastic programming. In this study, the electricity price in the pool as well as the rate of availability (unavailability) of the generating unit (forced outage rate) is considered as uncertain parameters. Th...
Although many production scheduling systems are developed, it is difficult to introduce for medium-sized enterprises, because of high cost of initial and maintenance investment. However the functions provided by it, such as available-to-promise under the restrictions of the own process, resource leveling and so on, are required by all of the enterprises to make their profits. The concept of "sp...
this paper proposes a new method of gain scheduling control design for a nonlinear system which is described as linear parameter varying form. a performance measure based on linear matrix inequality is introduced. to consider stability and performance measures in design process, the h∞ loop-shaping method is used to design the local controllers, which can be described as state feedback observer...
Selection of an appropriate set of Information System (IS) projects is a critical business activity which is very helpful to all organizations. In this paper, after describing real IS project selection problem of Iran Ministry of Commerce (MOC), we introduce two Data Envelopment Analysis (DEA) models. Then, we show applicability of introduced models for identifying most efficient IS project fro...
In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...
evolving models have found applications in many real world systems. in this paper, potentials of the evolving linear models (elms) in tracking control design for nonlinear variable structure systems are introduced. at first, an elm is introduced as a dynamic single input, single output (siso) linear model whose parameters as well as dynamic orders of input and output signals can change through ...
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
Recently the concept of facility efficiency, which defined by data envelopment analysis (DEA), introduced as a location modeling objective, that provides facilities location’s effect on their performance in serving demands. By combining the DEA models with the location problem, two types of “efficiencies” are optimized: spatial efficiency which measured by finding the least cost location and al...
the major problem of wind turbines is the great variability of wind power production. the dynamic change of the wind speed returns the quantity of the power injected to networks. therefore, wind–thermal generation scheduling problem plays a key role to implement clean power producers in a competitive environment. in deregulated power systems, the scheduling problem has various objectives than i...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید