Vikas S. Jadhav V. H. Bajaj

In this paper, we propose n-jobs to be processed on Single Machine Scheduling Problem (SMSP) involving fuzzy processing time and fuzzy due dates. The different due dates for each job be considered which meet the demand of customer with more satisfaction level. The main objective of this paper is the total penalty cost to be minimum in the schedule of the jobs on the single machine. This cost is...

Journal: :Journal of the Korean Operations Research and Management Science Society 2013

Journal: :Annals OR 2003
J. Christopher Beck Philippe Refalo

A hybrid technique using constraint programming and linear programming is applied to the problem of scheduling with earliness and tardiness costs. The linear model maintains a set of relaxed optimal start times which are used to guide the constraint programming search heuristic. In addition, the constraint programming problem model employs the strong constraint propagation techniques responsibl...

1996
H. A. ten Kate J. Wijngaard

A single machine scheduling problem is described which covers earliness costs, tardiness costs and setup costs. Setups are needed whenever a switch is made to a job of another product family. All jobs within the same product family have the same processing time. Besides setup costs also setup times are involved. Idle time is allowed, preemption is not allowed. Both a mixed integer programming f...

2004
Pankaj Chandra Peeyush Mehta Devanath Tirupati

The main objective of the working paper series of the IIMA is to help faculty members to test out their research findings at the pre-publication stage. Abstract We address the permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries follow flowshop type of production process. There are...

Journal: :INFORMS Journal on Computing 2015
Halil Sen Kerem Bülbül

Abstract: Research on due date oriented objectives in the parallel machine environment is at best scarce compared to objectives such as minimizing the makespan or the completion time related performance measures. Moreover, almost all existing work in this area is focused on the identical parallel machine environment. In this study, we leverage on our previous work on the single machine total we...

2008
Philippe Baptiste Ruslan Sadykov

We study the scheduling situation in which a set of jobs subjected to release dates and deadlines are to be performed on a single machine. The objective is to minimize a piecewise linear objective function ∑ j Fj where Fj(Cj) corresponds to the cost of the completion of job j at time Cj . This class of function is very large and thus interesting both from a theoretical and practical point of vi...

Journal: :Systems 2023

This paper investigates single-machine scheduling with a deteriorating maintenance activity, where the processing time of job depends on whether it is handled before or after activity. Under common and slack due date assignments, aim to find optimal schedule, position value (flow-allowance) so that linear weighted sum earliness, tardiness minimized, weights are location-dependent (position-depe...

Journal: :Journal of Industrial and Management Optimization 2021

This paper considers single machine due-window assignment scheduling problems with position-dependent weights. Under the learning and deterioration effects of jobs processing times, our goal is to minimize weighted sum earliness-tardiness, starting time due-window, size, where weights only depends on their position in a sequence (i.e., weights). common (CONW), slack (SLKW) different (DIFW) assi...