Journal: :Discrete Applied Mathematics 2021

In the Multi-Spreader Crane Scheduling Problem (MSCSP), containers with identical dimensions but variable weights are arranged along a grid. A multi-spreader crane is used to lift all containers. The has m > 1 modes. When it in p th mode, can remove adjacent same row at time as long total weight of does not exceed loading capacity ? . Such takes h minutes. It also c , q minutes for switch from ...

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

2010
Ilaria Vacca Matteo Salani Michel Bierlaire

Over the last years, international sea freight container transportation has grown dramatically and container terminals play nowadays a key role within the global shipping network. Terminal’s operations have received increasing interest in the scientific literature and operations research techniques are more and more used to improve efficiency and productivity. In this work we provide an overvie...

2007
Anna Sciomachen Elena Tanfani

This paper addresses the problem of determining stowage plans for containers in a ship, that is the so-called master bay plan problem (MBPP). MBPP is NP-complete [Botter, R.C., Brinati, M.A., 1992. Stowage container planning: A model for getting an optimal solution. IFIP Transactions B (Applications in Technology) B-5, 217–229; Avriel, M., Penn, M., Shpirer, N., 2000. Container ship stowage pro...

Dehua Xu, Hongxing Li Jinquan Li,

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

2011
Mihalis M. Golias

Berth ~hed.ulin9 is a critical functi?" at marine container terminals and determining the best berth schedule depends on several factors including the type and function of the port, size of the port, location, nearby competition, and type of contractual ~greement between the terminal and the carriers. In this paper we formulate the berth scheduling problem as a bi-objective mixed· Integer probl...

The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotiv...

Journal: :International Journal of Mechanical Engineering Technologies and Applications 2023

The purpose of this study is to determine the effectiveness and productivity Quay Container Crane (QCC) work through value OEE (availability, performance, quality) identify losses affecting QCC. method used a explorative descriptive analysis, which exposes availability, performance quality based on actual data information by collecting, compiling, classifying analysing about Crane. results are ...