نتایج جستجو برای: scheduling algorithm

تعداد نتایج: 795963  

Journal: :Mathematical Problems of Computer Science 2018

Journal: :International Journal of Applied Information Systems 2013

Journal: :Communications and Network 2013

Journal: :International Journal of Foundations of Computer Science 2003

Journal: :مهندسی صنایع 0
جعفر باقری نژاد استادیار دانشکده مهندسی صنایع - دانشگاه الزهرا (س) فریبرز جولای استاد دانشکده مهندسی صنایع -پردیس دانشکده های فنی-دانشگاه تهران زهرا رفیعی مجد کارشناس ارشد مهندسی صنایع - دانشگاه الزهرا (س)

in this study, we present a mrcpsp/max (multi-mode resource-constrained project scheduling problem with minimum and maximum time lags) model with minimization tardiness costs and maximization earliness rewards of activities as objective. the proposed model is nearby to real-world problems and has wide applications in various projects. this problem is not available in the literature exactly and ...

Journal: :journal of optimization in industrial engineering 2010
mehrzad abdi khalife babak abbasi amirhossein kamali dolat abadi

in this paper, we considered solving approaches to flexible job shop problems. makespan is not a good evaluation criterion with overlapping in operations assumption. accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. as overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

Journal: :Procedia Computer Science 2015

Khalili, Tavakkoli-Moghaddam,

  We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...

In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery.  jobs have to be scheduled on a single machine and delivered to  customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...

Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید