نتایج جستجو برای: project selection and scheduling

تعداد نتایج: 16906528  

ژورنال: سلامت کار ایران 2019

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

Journal: :مدیریت صنعتی 0
غلامحسین نیکوکار دانشیار مدیریت سیستم، دانشگاه جامع امام حسین (ع)، تهران، ایران یاسر علی دادی تلخستانی دانشجوی دکتری مدیریت منابع انسانی، دانشگاه آزاد اسلامی واحد قزوین، ایران محمد مهدوی مزده استادیار دانشکدۀ مهندسی صنایع، دانشگاه علم و صنعت ایران، تهران، ایران سید جلال موسوی دانشجوی دکتری مهندسی صنایع، گرایش سیستم و بهره‎وری، دانشگاه علم و صنعت ایران، تهران، ایران

an alternative for decreasing risk for knowledge workers is effective & optimized work break.major performance criteria in r&d; based organization is successful projects. selection of opproporiate members can be a most effect on the projects achievement. but as the selection of r&d; special members lead to decrease of risk, repeatative participation of this people in the same project lead to kn...

Journal: :journal of advances in computer engineering and technology 0
minoo soltanshahi computer engineering department, kerman branch, islamic azad university, iran.

cloud computing is the latest technology that involves distributed computation over the internet. it meets the needs of users through sharing resources and using virtual technology. the workflow user applications refer to a set of tasks to be processed within the cloud environment. scheduling algorithms have a lot to do with the efficiency of cloud computing environments through selection of su...

Journal: :iranian journal of management studies 2015
mostafa zareei hossein ali hassan-pour

this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

2013
Shivam Agarwal Tushar Bhat

This work describes a novel approach towards solving Multimode Resource Constrained Project Scheduling (MRCPS) Problems and an algorithm developed to implement this approach. The algorithm is intended to be used as an alternative to the various genetic algorithms currently being used to solve such problems. Using a deterministic approach that aims to select the optimum modes for execution as ef...

Due to the particular importance of projects in human life and in organizations, proper project management has been always regarded highly by researchers and practitioners. Recent advances in technology and fundamental changes in most scientific areas have affected projects and made their nature and environmental circumstances much more complex than in the past. Fortunately, in recent years, ma...

Journal: :journal of optimization in industrial engineering 2015
farshad faezy razi

project selection is considered as an important problem in project management. it is multi-criteria in nature and is based on various quantitative and qualitative factors. the main purpose of this paper is to present a new rank-based method for project selection in outranking relation. according to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

Journal: :journal of optimization in industrial engineering 2014
zahra sadat hosseini javad hassan pour emad roghanian

in this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the p-mmrcpsp while due dates are included i...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید