The case studied in the paper proves that thickening the pile cap is an effective seismic retrofit alternative to strengthen a pile group foundation. Unlike the typical seismic retrofitting of foundation, the proposed method eliminates the need to drive long piles into existing bridge substructures, substantially reducing cost, construction time and traffic interruption. The method thickens the...