2005
Han Hoogeveen

In this paper we give a survey of the most important results on multicriteria scheduling that have appeared in the literature or are to appear. We provide an extensive introduction including two example problems and then discuss the relevant literature. Here we pay special attention to the area of earliness-tardiness scheduling, scheduling with controllable processing times, simultaneous approx...

2004
Francis Sourd

The one-machine scheduling problem with sequence-dependent setup times and costs and earliness-tardiness penalties is addressed. This problem is NP-complete, so that local search approaches are very useful to efficiently find good feasible schedules. In this paper, we present an extension of the dynasearch neighborhood for this problem. Finding the best schedule in this neighborhood is shown to...

Journal: :Rairo-operations Research 2021

In this study, we consider single-machine scheduling problems with past-sequence-dependent (denoted by psd) setup times in which the of jobs are proportional to length already processed jobs. Under common (CON) and slack (SLK) due-date assignment methods, prove that weighted sum earliness, tardiness minimization remains polynomially solvable. We also give some extensions for psd times.

Journal: :Computers & OR 2008
Chung-Lun Li Gur Mosheiov Uri Yovel

We consider a single-machine scheduling problem with equal-sized jobs. The objective is to minimize the maximum weighted earliness-tardiness and due-date costs. We present an algorithm to solve this problem. Our algorithm makes use of bottleneck jobs and priority queues, and has a computational complexity of O(n logn). This complexity is a significant improvement of the existing algorithm in th...

Journal: :European Journal of Operational Research 2010
Marie-Christine Plateau Yasmin A. Rios-Solis

We consider the unrelated parallel machines scheduling problem where jobs have earliness and tardiness penalties and a common due date. We formulate this problem and some of its variants as 0-1 programs with quadratic objective function subject to linear constraints. The main contribution of this paper is to use and develop different convex reformulations to solve exactly the quadratic programs...

2013
JINTAO MENG SHISHENG LI

We consider the problem of common due window location scheduling on a single machine, where the processing times of jobs depend both on their starting times and positions in a sequence. The problem is to determine the optimal earliest due date, the due window size, and the job schedule simultaneously to minimize costs for earliness, tardiness, earliest due date assignment and due window size pe...

Journal: :Inf. Process. Lett. 1996
Bahram Alidaee Ahmad Ahmadian

Alidaee and Ahmadian considered a single machine scheduling problem with varying processing times, and presented a polynomial algorithm that minimizes the sum of absolute deviations of jobs’ completion times from a common due date. In this short note we remark that it is possible to eliminate one of the algorithm steps, therefore obtaining a more efficient procedure. We also show that the appro...

2014
M. Berke Pamay Kerem Bülbül Gündüz Ulusoy

In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while keeping the costs related to changes in the sc...

Journal: :Scientia Iranica 2023

In this paper, a multi objective model in which operation planning and tool assignment flexible manufacturing system (FMS) has been considered simultaneously. regard, the main characteristics of FMS have analyzed. Then, comprehensive model, including major parameters cost components designed presented. The proposed contains factors machining cost, earliness tardiness penalties, part movement or...

Journal: :Annals OR 2003
J. Christopher Beck Philippe Refalo

A hybrid technique using constraint programming and linear programming is applied to the problem of scheduling with earliness and tardiness costs. The linear model maintains a set of relaxed optimal start times which are used to guide the constraint programming search heuristic. In addition, the constraint programming problem model employs the strong constraint propagation techniques responsibl...