نتایج جستجو برای: رویکرد ارزش مکتسبه evm
تعداد نتایج: 76770 فیلتر نتایج به سال:
Lehre im Bereich von ERP-Systemen ist mit Blick auf den hohen organisatorischen und systemtechnischen Einführungsaufwand nicht einfach zu gestalten. Noch schwieriger ist es, Studierenden dabei Kenntnisse in der Tiefe zu vermitteln (z.B. durch intensive Auseinandersetzung mit einem einzelnen System) sowie ihnen einen Überblick in der Breite zu verschaffen. Das im Beitrag vorgestellte Konzept ein...
Hanme Kim1 [email protected] Ankur Handa2 [email protected] Ryad Benosman3 [email protected] Sio-Hoi Ieng3 [email protected] Andrew J. Davison1 [email protected] 1 Department of Computing, Imperial College London, London, UK 2 Department of Engineering, University of Cambridge, Cambridge, UK 3 INSERM, U968, Paris, F-75012, France; Sorbonne Universités, UPMC Univ Paris 06, UMR...
این پژوهش، به معرفی نظریه ارزش فرین به عنوان سنجه ای مفید در اندازه گیری ریسک رویدادهای فرین (رویدادهای نادر، ولی با تأثیر بالا) می پردازد. رفتار مشترک در محاسبه ارزش در معرض ریسک برپایه این فرض است که تغییر در ارزش سبد سرمایه گذاری، توزیع نرمال دارد و مشروط بر اطلاعات گذشته است. با این حال، بازده دارایی ها بهطور معمول ازتوزیع هایی با دنباله های پرتراکم ناشی می شود. بنابراین، محاسبات ارزش در م...
Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder. Internal use. Permission to reproduce this document and to prepare derivative works from this document for internal use is granted, provided the copyright and " No Warranty " statements are included with all reproductions and derivative works. External use. Requests for permission ...
Earned value management (EVM) is a project approach that can enhance the probability of success. It applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through use an earned system (EVMS). A holistic up-to-date literature review on EVM EVMS does not exist. provide comprehensive perspective topic, identifying summarizing...
Civil aviation is one of biggest industrial contributors to CO2 emissions worldwide. One the most urgent problems this sector providing new technologies continue operating in a more sustainable environment through transition clean energy. The Earned Value Management (EVM) model, as traditional project management tool, continuously being revised with releases and extensions (e.g., ESM, EDM, QEVM...
This paper discusses the current developments within a novel environment to perform related model-based activities. In particular, the paper focuses in the modules corresponding to data preprocessing and dynamic data reconciliation. In terms of the former module, this work discusses the implementation of three approaches based on the minimum median distance (MMD), the moving median (MM), and th...
Biomimetic scaffolds hold great promise for therapeutic repair of cartilage, but although most scaffolds are tested with cells in vitro, there are very few ex vivo models (EVMs) where adult cartilage and scaffolds are co-cultured to optimize their interaction prior to in vivo studies. This study describes a simple, non-compressive method that is applicable to mammalian or human cartilage and pr...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید