نتایج جستجو برای: setup cost

تعداد نتایج: 418274  

Journal: :journal of optimization in industrial engineering 2014
behzad nikjo javad rezaeian

this paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. gaining an optimal s...

2002
Susana K. Lai-Yuen Yuan-Shin Lee

This paper presents the techniques of tool path planning and an activity-based manufacturing cost analysis for the simultaneous turn-mill machining. The new turn-mill machine tools allow the parallel processing of both multi-axis milling and turning operations simultaneously. Turn-mill machine tools have been identified to be able to significantly reduce the total setup time and manufacturing c...

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

R. Uthayakumar S. Tharani

Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have focused on developing rework model, but few of them have developed model for deteriorating items. Due to t...

Journal: :European Journal of Operational Research 2008
Zrinka Lukac Kristina Soric Visnja Vojvodic Rosenzweig

Each of n products is to be processed on two machines in order to satisfy known demands in each of T periods. Only one product can be processed on each machine at any given time. Each switch from one item to another requires sequence dependent setup time. The objective is to minimize the total setup time and the sum of the costs of production, storage and setup. We consider the problem as a bil...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید