Given a block-model of an open cut mine, a production scheduling policy defines which blocks should be extracted, when they should be extracted, and what should be done with them once extracted (i.e., sent to a mill, waste-dump, stockpile, etc.). The conventional three-step heuristic for constructing such a scheduling is as follows: First, compute an ultimate-pit. Second, subdivide the ultimate...
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
We present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature ...
Optimization of Design Parameters and Intelligent Back-analysis of High Bench Dump Slope in Open Pit
Dump engineering is an important part in production processes of open-pit mining. In order to complete the mine production tasks smoothly, it is necessary to make the most of land possessed by the dump in an economical and reasonable way. In the paper, we use the dump of Qidashan iron mine which belongs to Anshan Iron and Steel Group as an engineering background to achieve the aim of improving ...
A crucial problem in the mining industry is to determine the optimal sequence of extraction of blocks, in which the mine has been structured for exploitation. Typically a mine can be constituted by several thousands or millions of blocks. The sequencing models for this structure are very complex giving rise to very large combinatorial linear models. Operational mine plans are usually produced o...
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....
The research area is located at Batu Hijau Mine – PT Amman Mineral Nusa Tenggara, administratively located at the southwestern of Sumbawa, West Nusa Tenggara Province – Indonesia. The research area is controlled by tectonism in accordance to close with the active tectonic plate at southern part of this island. The presence of the active tectonic regime causes of the rich deposit of ore minerali...
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...