نتایج جستجو برای: multi skilled project scheduling

تعداد نتایج: 764617  

2013
Amir Abbas Najafi

In this paper the multi-mode resource-constrained project scheduling problem with discounted cash flows is considered. Minimizing the makespan and maximization the net present value (NPV) are the two common objectives that have been investigated in the literature. We apply one evolutionary algorithm named multiobjective particle swarm optimization (MOPSO) to find Pareto front solutions. We used...

Journal: :مهندسی صنایع 0
یعقوب قلی پور 1 school of civil engineering mohammad mehdi shahbazi engineering optimization research group

during the implementation, construction projects usually encounter situation that considerably affects the project scheduling and cost. this study aims at using an improved version of the harmony search algorithm (hsa) to schedule resource constrained construction projects. this model is formulated as a global optimization problem. it will determine the duration of each activity to minimize the...

Journal: :JCP 2012
Ikno Kim Junzo Watada

This article presents a novel integrated method in which bio-soft computational and tabu search methods are both used to solve a multi-task project scheduling problem. In this scheduling problem, the main challenge is to determine the most reliable completion time. To solve this problem, we first use our proposed bio-soft computational method. Next, a tabu search method is used to verify the fi...

Journal: :Inteligencia Artificial, Revista Iberoamericana de Inteligencia Artificial 2006
Antonio Luis Lova María Pilar Tormos Federico Barber

This work deals with the multi-mode resource-constrained project scheduling problem. In this problem, activities of the project may be executed in more than one operating mode and renewable resource constraints exist. Each activity operation mode has a different duration and requires different amount of renewable resources. The objective function considered is the minimisation of the project co...

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

I. Bossaghzadeh S. R. Hejazi Z. Pirmoradi

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

2013
Anca Andreica Camelia Chira

Multi-Mode Resource-Constrained Project Scheduling is an NP-hard optimization problem intensively studied due to its large area of applications. This paper concentrates on the evolutionary approaches to Multi-Mode Resource-Constrained Project Scheduling based on permutation encoded individuals. A new recombination operator is presented and a comparative analysis of several recombination operato...

Journal: :مهندسی صنایع 0
جعفر باقری نژاد استادیار دانشکده مهندسی صنایع - دانشگاه الزهرا (س) فریبرز جولای استاد دانشکده مهندسی صنایع -پردیس دانشکده های فنی-دانشگاه تهران زهرا رفیعی مجد کارشناس ارشد مهندسی صنایع - دانشگاه الزهرا (س)

in this study, we present a mrcpsp/max (multi-mode resource-constrained project scheduling problem with minimum and maximum time lags) model with minimization tardiness costs and maximization earliness rewards of activities as objective. the proposed model is nearby to real-world problems and has wide applications in various projects. this problem is not available in the literature exactly and ...

Journal: :Expert Systems With Applications 2022

Multi-project management and uncertain environment are very common factors, they bring greater challenges to scheduling due the increase of problem complexity response efficiency requirements. In this paper, a novel hyper-heuristic based filtering genetic programming (HH-FGP) framework is proposed for evolving priority rules (PRs) deal with multi-project considering stochastic activity duration...