Journal: :Algorithms 2017
Laxmi A. Bewoor V. Chandra Prakash Sagar U. Sapkal

The no-wait flow shop is a flowshop in which the scheduling of jobs is continuous and simultaneous through all machines without waiting for any consecutive machines. The scheduling of a no-wait flow shop requires finding an appropriate sequence of jobs for scheduling, which in turn reduces total processing time. The classical brute force method for finding the probabilities of scheduling for im...

Journal: :Algorithms 2014
Antonio Costa Fulvio Antonio Cappadonna Sergio Fichera

Production processes in Cellular Manufacturing Systems (CMS) often involve groups of parts sharing the same technological requirements in terms of tooling and setup. The issue of scheduling such parts through a flow-shop production layout is known as the Flow-Shop Group Scheduling (FSGS) problem or, whether setup times are sequence-dependent, the Flow-Shop Sequence-Dependent Group Scheduling (F...

Journal: :Computers & Industrial Engineering 2016
Dmitry A. Ivanov Alexandre Dolgui Boris V. Sokolov

Coordination plays crucial role in supply chain scheduling. In this paper, we extend the existing body of literature on supply chain scheduling by representing the robust schedule coordination approach. A hybrid discrete/continuous flow shop supply chain with job shop processes at each supplier stage is studied with dynamic optimal control models. We consider operations, channel, resource and f...

2010
Tianmin Zheng Mitsuo Yamashiro

This paper is the first to consider the hybrid quantum-inspired evolutionary algorithm (HQEA) on the no-wait permutation flow shop scheduling problem (PFSP) for minimizing the makespan. In this HQEA, the quantum chromosomes are encoded by using the quantum rotating angle and a simple but efficient converting mechanism for determining job sequence is proposed for the representation of solution f...

2007
Jitti Jungwattanakit Manop Reodecha Frank Werner

This paper investigates scheduling heuristics to seek the minimum of a positively weighted convex sum of makespan and the number of tardy jobs in a hybrid flow shop environment where at least one production stage is made up of unrelated parallel machines. Sequence-and machine-dependent setup times are considered. The problem is a combinatorial optimization problem which is difficult to be solve...

2013
M. K. Marichelvam T. Prabaharan Xin-She Yang M. Geetha

This paper investigates the multistage hybrid flow shop (HFS) scheduling problems using the new bat algorithm. A HFS is the generalisation of flowshop with multiple machines. HFS is one of the important scheduling problems that represent many industries like iron and steel, chemical, textile and ceramic industries. The HFS scheduling problems have been proved to be NP-hard. A recently developed...

Journal: :CoRR 2014
Sandeep Kumar Pooja Jadon

In the present scenario the recent engineering and industrial built-up units are facing hodgepodge of problems in a lot of aspects such as machining time, electricity, man power, raw material and customer’s constraints. The job-shop scheduling is one of the most significant industrial behaviours, particularly in manufacturing planning. This paper proposes the permutation flow shop sequencing pr...

2017
Vikram Srinivasan Daryl L. Santos

Minimum makespan scheduling of Flow Shops with Multiple Processors (FSMPs), also known as the Hybrid Flow Shop (HFS), is classified as NP complete. Thus, the FSMP largely depends on strong heuristics to develop solutions to makespan scheduling instances. An FSMP consists of m stages wherein each stage has one or more processors through which n jobs are scheduled. This paper presents a heuristic...

2011
J M J Schutten

We consider the problem of scheduling jobs in a hybrid job shop We use the term hybrid to indicate that we consider a lot of extensions of the classic job shop such as transportation times multiple resources and setup times The Shifting Bottleneck procedure can be generalized to deal with those extensions We test this approach for an assembly shop In this shop we study the in uence of static an...