نتایج جستجو برای: because it has less negative net present value
تعداد نتایج: 6069438 فیلتر نتایج به سال:
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
The optimal allocation of water is importance because Yazd province has very limited access to water resources. The optimal allocation requires that the water price be approximately equal to its economic value. Accordingly, the present paper calculated the economic value of water consumed by manufacturing industries in Yazd province. The Cobb-Douglas, transcendental, translog, generalized quadr...
Incorporating a household’s net sale status into a rearranged Slutsky equation with combined ordinary and endowment income effects, this paper aims to reinterpret the income elasticity of demand in the case of buying and selling and to associate it with types of goods in a novel manner. To this end, the Deaton’s (1989) net benefit ratio (NBR) approach is expressed as the difference between orig...
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
With the existence of ambiguity in the financial processes of projects, fuzzy concepts are being implemented into the foundation and essence of the current article. Authors have employed chance constrained programming and simulated annealing as appropriate tools for determining the net present worth value of several projects. At the end, the most economical project was chosen. In this article, ...
flow in natural river bends is a complex and turbulent phenomenon which affects the scour and sedimentations and causes an irregular bed topography on the bed. for the reason, the flow hydralics and the parameters which affect the flow to be studied and understand. in this study the effect of bed and wall roughness using the software fluent discussed in a sharp 90-degree flume bend with 40.3cm ...
Net pay thickness is defined as that portion of a reservoir which contains economically producible hydrocarbons with today’s technology, prices, and costs. This thickness is a key parameter of the volumetric calculation of in-place hydrocarbons, well test interpretation, and reservoir characterization. A reservoir interval is considered as net pay when it contains hydrocarbons that can flow at ...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید