[ 1 ] - Soft Foundation Strengthening Effect and Structural Optimization of a New Cement Fly-ash and Gravel Pile-slab Structure
Reducing the settlements of soft foundation effectively is a critical problem of high-speed railway construction in China. The new CFG pile-slab structure composite foundation is a ground treatment technique which is applied on CFG pile foundation and pile-slab structure composite foundation. Based on the experience of constructing Beijing-Shanghai high-speed railway in China, the settlement-co...
[ 2 ] - New Analytic Method for Subgrade Settlement Calculation of the New Cement Fly-ash Grave Pile-slab Structure
At present, reducing subgrade settlement of soft soil foundation is a key problem in high-speed railway construction. Pile-slab structure is a widely-utilized form of foundation structure to reduce the subgrade settlement in China. In order to save the engineering cost for high-speed railway construction in developing countries, the author developed a pile-slab structure and named it as the new...
[ 3 ] - Physical Model Test and Numerical Simulation Study of Deformation Mechanism of Wall Rock on Open Pit to Underground Mining (RESEARCH NOTE)
This paper is based on the open pit to underground mining practice of Daye Iron Mine. The influence mechanism between high-steep slope and non-pillar sublevel caving method is studied by using physical model test. Firstly, engineering geological properties of the choosing typical research section is analysed and generalized. Secondly, the system of open pit to underground mining is developing a...