[ 1 ] - مدلسازی و زمانبندی مسائل جریان کارگاهی مونتاژ دو مرحلهای با ماشینهای مونتاژ غیرهمسان
The purpose of this research is to deal with the problem of two-stage assembly flow shop scheduling. A number of single-item products (identical) each formed of several different parts are ordered. Each part has m operations done at the first stage with m different machines. After manufacturing the parts, they are assembled into a final product with some non-identical machines. The purpose of ...