حامدی, مریم

دانشگاه پیام نور، گروه مهندسی صنایع، تهران

[ 1 ] - ارایه یک روش ابتکاری برای زمانبندی مساله فلوشاپ ترکیبی دو مرحله ای چند معیاره

A two-stage hybrid flow shop problem can be considered as part of a larger issue; when solved, it can find a partial solution of a main and bigger problem. Here and in the current paper, a two-stage hybrid flow shop problem with one machine in the first stage and two machines in the second stage with three criteria such as: 1) maximum manufacturing time, 2) average manufacturing time and 3) sum...

[ 2 ] - Truck Scheduling in a Cross-Docking Terminal by Using Novel Robust Heuristics

Nowadays, one of the major goals of the distribution environment is to reduce lead times and inventories. Cross-docking is a logistics technique which removes the storage and picking up the functions of a warehouse. The term cross-docking refers to moving products directly from incoming to outgoing trailers with little or no storage in between. According to the recent related papers, the truck ...

نویسندگان همکار