Maboudian, Y.
[ 1 ] - زمانبندی جریان کارگاهی مونتاژ با زمان آمادهسازی وابسته به توالی و زمان حمل و نقل
In this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. This problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. In this mode...
نویسندگان همکار