soroush aghamohamadi
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
[ 1 ] - A New Hybrid Meta-Heuristics Approach to Solve the Parallel Machine Scheduling Problem Considering Human Resiliency Engineering
This paper proposes a mixed integer programming model to solve a non-identical parallel machine (NIPM) scheduling with sequence-dependent set-up times and human resiliency engineering. The presented mathematical model is formulated to consider human factors including Learning, Teamwork and Awareness. Moreover, processing time of jobs are assumed to be non-deterministic and dependent to their st...
[ 2 ] - An Option-Revenue Sharing Coordination Contract with Price and Sales Effort Dependent Demand
This study proposes a novel option-revenue sharing coordination contract framework. In the proposed model, the retailer determines the number of order sales effort. The manufacturer sets the price of products for the wholesale strategy. The investigated supply chain problem analyzes the results of different strategies. In the proposed coordination contract problem, two types of games including ...
[ 3 ] - Designing a green location routing inventory problem considering transportation risks and time window: a case study
This study introduces a green location, routing and inventory problem with customer satisfaction, backup distribution centers and risk of routes in the form of a non-linear mixed integer programming model. In this regard, time window is considered to increase the customer satisfaction of the model and transportation risks is taken into account for the reliability of the system. In addition, dif...
[ 4 ] - حل مسأله مکان یابی-مسیریابی-موجودی شبکه ی جمع آوری زباله های خطرناک با در نظر گرفتن ناوگان حمل و نقل داخلی و خارجی
این پزوهش به طراحی شبکهی جمع آوری زباله های خطرناک پرداخته و برای انجام این کار از مفاهیم مکانیابی، مسیریابی، موجودی و زنجیرهی لجستیک معکوس استفاده شده است. موارد مربوط به ریسک احداث مراکز و حمل مواد به عنوان پارامترهای اجتماعی در این پژوهش به عنوان یک تابع هدف جداگانه در کنار تابع هدف اقتصادی، در نظر گرفته شده است. مسأله مورد نظر در قالب مدل برنامهریزی خطی عدد صحیح مختلط با دو تابع هدف فرمو...
نویسندگان همکار