[ 1 ] - Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment

Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...