Armin Taheri Nakhost

Department of petroleum engineering

[ 1 ] - A SIMULATION OF MANAGED PRESSURE DRILLING IN IRANIAN DARQUAIN OIL FIELD

The narrow operating window between pore pressure and fracture pressure makes drilling difficult in some operations. A feasibility study of managed pressure drilling (MPD) is carried out on Iran Darquain oil field. The previous wells drilled in this field showed that mud returns were lost during drilling Gadvan formation. The present work addresses this problem by means of surface back pressure...

نویسندگان همکار