Seyed Hadi Hoseinie
Division of Operation and Maintenance Engineering, Luleå University of Technology
[ 1 ] - Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine
Utilizing the gathered failure data and failure interval data from Tabas coal mine in two years, this paper discusses the reliability of powered supports. The data sets were investigated using statistical procedures and in two levels: the existence of trend and serial correlation. The results show that the powered supports follow the Gamma reliability function. The reliability of the machine de...
نویسندگان همکار