Seyed H. Hoseinie
Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran
[ 1 ] - Simulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
نویسندگان همکار