Majid Alipour
M.Sc. Student, Dept. of Civil Eng., Iran University of Science and Technology, Tehran, Iran
[ 1 ] - Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic
The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...
نویسندگان همکار