Two Strategies Based on Meta-Heuristic Algorithms for Parallel Row Ordering Problem (PROP)
نویسندگان
چکیده مقاله:
Proper arrangement of facility layout is a key issue in management that influences efficiency and the profitability of the manufacturing systems. Parallel Row Ordering Problem (PROP) is a special case of facility layout problem and consists of looking for the best location of n facilities while similar facilities (facilities which has some characteristics in common) should be arranged in a row and dissimilar facilities should be arranged in a parallel row. As PROP is a new introduced NP-hard problem, only a mixed integer programming model is developed to formulate this problem. So to solve large scale instances of this problem, heuristic and meta-heuristic algorithms can be useful. In this paper, two strategies based on genetic algorithm (GA) and a novel population based simulated annealing algorithm (PSA) to solve medium and large instances of PROP are proposed. Also several test problems of PROP in two groups with different sizes that have been extracted from the literature are solved to evaluate the proposed algorithms in terms of objective function value and computational time. According to the results, in the first group of instances, both algorithms almost have equal performances, and in the second group PSA shows better performance by increasing the size of test problems.
منابع مشابه
Two new heuristic algorithms for Covering Tour Problem
Covering Tour Problem (CTP) is the generalized form of Traveling Salesman Problem (TSP), which has found different applications in the designing of distribution networks, disaster relief, and transportation routing. The purpose of this problem is to determine the Hamiltoniancyclewiththe lowest costusinga subset of all the nodes, such that the other nodes would be in a distance shorter than the ...
متن کاملModeling the Time Windows Vehicle Routing Problem in Cross-Docking Strategy Using Two Meta-Heuristic Algorithms
In cross docking strategy, arrived products are immediately classified, sorted and organized with respect to their destination. Among all the problems related to this strategy, the vehicle routing problem (VRP) is very important and of special attention in modern technology. This paper addresses the particular type of VRP, called VRPCDTW, considering a time limitation for each customer/retai...
متن کاملTwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...
متن کاملThree Meta-heuristic Algorithms for the Single-item Capacitated Lot-sizing Problem (RESEARCH NOTE)
This paper proposes a mixed integer programming model for single-item capacitated lot-sizing problem with setup times, safety stock, demand shortages, outsourcing and inventory capacity. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA), vibration damping optimization (VDO) and harmony search (HS) have been used to solve this model. Additionally, ...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملtwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
this paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. in addition, the setup time of a job on each machin...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 10 شماره 2
صفحات 467- 498
تاریخ انتشار 2017-04-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023