Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel

نویسنده

چکیده مقاله:

The lining structure of Tunnel Boring Machine (TBM) excavated tunnels is composed of series of precast Reinforced Concrete (RC) pieces which are called segment. At the present paper, a novel method is introduced for seismic retrofitting of segmental tunnels located at active fault zones in rock environment with case study of Amirkabir dam to Tehran water transfer tunnel (Karadj tunnel). The main design concept in this method is based on stiffness degradation of the tunnel structure intersecting tunnel with fault central zone. Even the strongest structures are not capable to undergo displacement of faults and will fail; so, the stiffness degradation and providing life safety operational limit is the logical solution. This phenomenon is developed due to creation of sequential joints‌ in segments intersecting tunnel with fault central zone; so, it is called sequential joints method. At this method, a joint is considered between each or multiple rings and using this method, the tunnel structure is synchronized with tunnel displacements during fault displacement process and the global failure of the tunnel structure is avoided. This method is currently applied in second part of Karadj water transfer tunnel (Part K”-BR).

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluation of structural analysis of tunnel segmental lining using beam-spring method and force-method (Case study: Chamshir water conveyance tunnel)

The joints between segmental rings can withstand a certain amount of bending moment as well as axial and shear forces. Generally, in the structural analysis of tunnel segmental lining, the joints can be modeled as elastic hinges or rotational springs, and their rigidity should be demonstrated in terms of the rigidity of the joints or their rotational stiffness. Therefore, the bending moment act...

متن کامل

Evaluation of TBM Utilization Using Rock Mass Rating System: A Case Study of Karaj-Tehran Water Conveyance Tunnel (Lots 1 and 2)

Successful application of a TBM in a project requires investigating both the ground conditions and the machine and backup system design features. Prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. In this respect, both penetration rate and advance rate must be estimated. Utilization factor, which depends on the type of op...

متن کامل

evaluation of structural analysis of tunnel segmental lining using beam-spring method and force-method (case study: chamshir water conveyance tunnel)

the joints between segmental rings can withstand a certain amount of bending moment as well as axial and shear forces. generally, in the structural analysis of tunnel segmental lining, the joints can be modeled as elastic hinges or rotational springs, and their rigidity should be demonstrated in terms of the rigidity of the joints or their rotational stiffness. therefore, the bending moment act...

متن کامل

evaluation of tbm utilization using rock mass rating system: a case study of karaj-tehran water conveyance tunnel (lots 1 and 2)

successful application of a tbm in a project requires investigating both the ground conditions and the machine and backup system design features. prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. in this respect, both penetration rate and advance rate must be estimated. utilization factor, which depends on the type of op...

متن کامل

Estimation of groundwater inflow situation using fuzzy logic: a case study (Beheshtabad water conveying tunnel, Iran)

Water inflow is one of the most important challenges in the underground excavations. In addition to inducing working conditions and environmental problems, it decreases the stability and quality of the surrounding rocks. The direct method of measuring rock mass hydraulic conductivity consists of drilling the boreholes and observing the rate of fluid lost in the boreholes. Applying this method i...

متن کامل

Exploration and Grouting of Large-Scale Water Capsule in the Fault Fracture Zone of Yonglian Tunnel

A large-scale water capsule was formed after 8 times inrush of mud and water in Yonglian tunnel. The capsule seriously inhabited the construction of the tunnel. By combining with the geological conditions in tunnel site, the causes and characteristics of the water capsule were analyzed. Its spatial location and size were explorated by comprehensive exploration methods. In order to control the w...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 52  شماره 1

صفحات  87- 94

تاریخ انتشار 2018-06-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023