The project portfolio selection and scheduling problem: mathematical model and algorithms

نویسنده

  • Bahman Naderi Young Researches Club, Qazvin Branch, Islamic Azad University
چکیده مقاله:

This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialist competitive algorithm, simulated annealing and genetic algorithm are developed to solve such a hard problem. The proposed algorithms employ advanced operators. The performance of the proposed algorithms is numerically evaluated. The results show the high performance of the imperialist competitive algorithm outperforms the other algorithms.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the project portfolio selection and scheduling problem: mathematical model and algorithms

this paper investigates the problem of selecting and scheduling a set of projects among available projects. each project consists of several tasks and to perform each one some resource is required. the objective is to maximize total benefit. the paper constructs a mathematical formulation in form of mixed integer linear programming model. three effective metaheuristics in form of the imperialis...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

a stochastic model for project selection and scheduling problem

resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

Comparison of particle swarm optimization and tabu search algorithms for portfolio selection problem

Using Metaheuristics models and Evolutionary Algorithms for solving portfolio problem has been considered in recent years.In this study, by using particles swarm optimization and tabu search algorithms we  optimized two-sided risk measures . A standard exact penalty function transforms the considered portfolio selection problem into an equivalent unconstrained minimization problem. And in final...

متن کامل

a multi- objective project portfolio selection and scheduling problem under uncertainty (case study: company of payafanavaran ferdowsi)

nowadays organization especially r&d; centers are dealing with project portfolio selection decisions under uncertainty. moreover in the most of the past research, project portfolio selection and scheduling are often considered to be independent problem. this leads to insufficient result in real world. so in this research simultaneous project portfolio selection and scheduling problem is modelin...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 6  شماره 13

صفحات  65- 72

تاریخ انتشار 2013-09-02

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023