Substation Expansion Planning Based on BFOA
نویسندگان
چکیده مقاله:
In recent years, significant research efforts have been devoted to the optimal planning of power systems. Substation Expansion Planning (SEP) as a sub-system of power system planning consists of finding the most economical solution with the optimal location and size of future substations and/or feeders to meet the future demand. The large number of design variables, and combination of discrete and continuous variables makes the substation expansion planning a very challenging problem. So far, various methods have been presented to solve such a complicated problem. Since the Bacterial Foraging Optimization Algorithm (BFOA) has been proper results in studies of power systems, and has not been applied to SEP problem yet, this paper develops a new BFO-based method to solve the SEP problem. The technique discussed in this paper uses BFOA to simultaneously optimize the sizes and locations of both the existing and new installed substation and feeders by considering reliability constraints. To clarify the capabilities of the presented method a typical network is considered and the results of applying GA and BFOA on the network are compared. The simulation results demonstrate that the BFOA has the potential to find more optimal results than the other algorithm under the same conditions. Also, the fast convergence, consideration of real-world networks limitations as problem constraints and simplicity in applying to large scale networks are the main features of the proposed method.
منابع مشابه
substation expansion planning based on bfoa
in recent years, significant research efforts have been devoted to the optimal planning of power systems. substation expansion planning (sep) as a sub-system of power system planning consists of finding the most economical solution with the optimal location and size of future substations and/or feeders to meet the future demand. the large number of design variables, and combination of discrete ...
متن کاملA MULTISTAGE EXPANSION PLANNING METHOD FOR OPTIMAL SUBSTATION PLACEMENT
Optimal distribution substation placement is one of the major components of optimal distribution system planning projects. In this paper optimal substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This procedure gives the optimal size, site and installation time of medium voltage substation, using their relate...
متن کاملA Multistage Expansion Planning Method for Optimal Substation Placement
The connection points between MV and LV distribution networks are MV substations. Optimal sitting, sizing and timing of MV substation placement is the major planning problem in MV-LV distribution system planning projects. In this paper the optimal MV substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This pro...
متن کاملTransmission expansion planning based on merchandizing surplus of transmission lines
This paper proposes an optimal transmission expansion planning (TEP) which is based on determining share of each line in merchandizing surplus (MS) of system, determining by Independent System Operator (ISO). The more share of a line in MS of system denotes the priority of a line for expansion. The procedure of determining MS of each line in a power system is based on determining the MS share o...
متن کاملRegulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model
In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG) investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind ...
متن کاملSub-transmission sub-station expansion planning based on bacterial foraging optimization algorithm
In recent years, significant research efforts have been devoted to the optimal planning of power systems. Substation Expansion Planning (SEP) as a sub-system of power system planning consists of finding the most economical solution with the optimal location and size of future substations and/or feeders to meet the future load demand. The large number of design variables and combination of discr...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 04 شماره 03
صفحات 177- 184
تاریخ انتشار 2015-09-01