Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

نویسندگان

  • A. A. Khodaiari School of Mining Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • A. Alipour School of Mining Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • A. Jafari School of Mining Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • R. Tavakkoli-Moghaddam School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran LCFC, Arts et Métier ParisTech, Centre de Metz, France
چکیده مقاله:

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust optimization is one of the most applicable methods in this area used in this study. Robust optimization based on the box counterpart formulation is applied to deal with the OPPS problem. To have a comparison between the solutions of the box counterpart optimization model and the deterministic model, a Two-Dimensional (2D) numerical study of a hypothetical open-pit mine is conducted followed by additional computations on the actual large-scale instances (Marvin orebody). This investigation shows that the different features of the robust planning under uncertainty can be scheduled. Also the price of robustness is obtained in different levels of conservatism.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

open-pit production scheduling (opps) problem focuses on determining a block sequencing and scheduling to maximize net present value (npv) of the venture under constraints. the scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. in order to deal with the opps uncertainties, various approaches can be recommended. robust opti...

متن کامل

Open Pit Mine Scheduling under Uncertainty: a Robust Approach

In order to carry out an open pit mining operation, planners must periodically prepare what is known as strategic mine plan. This is a tentative production schedule for the remaining life of the mine that defines which area of a mining reserve will be extracted, in what years this extraction will take place, which resources will be used for the extraction, and how the extracted material will be...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

An Uncertainty-based Transition from Open Pit to Underground Mining

There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...

متن کامل

A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...

متن کامل

Scheduling in iron ore open-pit mining

During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained probl...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 8  شماره 2

صفحات  255- 267

تاریخ انتشار 2017-04-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023