Net Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
نویسنده
چکیده مقاله:
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduling problem with NPV criterion. Second, the permutation flow shop scheduling problem is studied with NPV criterion. An efficient Branch & Bound algorithm is accordingly presented using strong lower and upper bounds and dominace rules which are expanded for this problem. Finally, three heuristic methods are presented and compared to find appropriate solutions over short periods. By generating random problems of different sizes, it has been shown that the Branch & Bound method is efficient in solving small and medium sized problems, and also that the presented heuristic algorithm is efficient in tackling problems of any size.
منابع مشابه
Modeling and scheduling no-idle hybrid flow shop problems
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...
متن کاملA New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study
This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation for new scenarios. Thus, a two-stage predictive algorithm is prop...
متن کاملStable laws and the present value of fixed cash-flows
In the current contribution, we consider the present value of a series of fixed cash flows under stochastic interest rates. In order to model these interest rates, we don’t use the common lognormal model, but stable laws, which better fit in with reality. For this present value, we want to derive a result about the distribution function. However, due to the dependencies between successive disco...
متن کاملMathematical Models of Flow Shop and Job Shop Scheduling Problems
In this paper, mathematical models for permutation flow shop scheduling and job shop scheduling problems are proposed. The first problem is based on a mixed integer programming model. As the problem is NP-complete, this model can only be used for smaller instances where an optimal solution can be computed. For large instances, another model is proposed which is suitable for solving the problem ...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 27 شماره 2
صفحات 49- 65
تاریخ انتشار 2009-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023