Minimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines
نویسندگان
چکیده مقاله:
Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environment, the first and third stages involve a single processor machine, and the second one consists of m identical parallel batch processing machines. The objective is to minimize the total weighted tardiness of the received orders.Given the lack of consideration of this problem in the literature, first, a mathematical programming model is presented for the problem. Also, due to the NP-hardness of the problem, a variable neighborhood search algorithm and a memetic algorithm are developed to solve it. The computational results show that the variable neighborhood search algorithm can solve instances up to 1200 orders and 15 machines with an average deviation of about 1.9%, relative to the best solution of the two algorithms, and the memetic algorithm can solve instances up to 1200 orders and 15 machines with an average deviation of about 7.8%, as compared e to the best solution of the two algorithms. In general, computational results show the better performance of the variable neighborhood search algorithm in comparison to the memetic algorithm.
منابع مشابه
Minimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA
This paper presents a bi-objective MIP model for the flexible flow shop scheduling problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...
متن کاملMinimizing Total Tardiness in a Hybrid Flexible Flowshop with Sequence Dependent Setup Times
In this paper, we propose different local search algorithms to solve a realistic variant of the flowshop problem. The variant considered here is a hybrid flexible flowshop problem with sequence-dependent setup times, and with the objective of minimizing the total tardiness. In this variant of flowshop, stage skipping might occur, i.e., not all stages must be visited by all jobs. This scheduling...
متن کاملA memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
This paper addresses a scheduling problem motivated by scheduling of diffusion operations in the wafer fabrication facility. In the target problem, jobs arrive at the batch machines at different time instants, and only jobs belonging to the same family can be processed together. Parallel batch machine scheduling typically consists of three types of decisions – batch forming, machine assignment,...
متن کاملMinimizing total weighted tardiness on a single batch process machine with incompatible job families
The di0usion step in semiconductor wafer fabrication is very time consuming, compared to other steps in the process, and performance in this area has a signi1cant impact on overall factory performance. Di0usion furnaces are able to process multiple lots of similar wafers at a time, and are therefore appropriately modeled as batch processing machines with incompatible job families. Due to the im...
متن کاملMinimizing the total tardiness in a flexible job-shop
In this article, we consider the minimization of the total tardiness in a flexible job-shop. In our knowledge, this criterion is not previously studied for this type of shop configuration. The total tardiness criterion was mainly considered in the single machine problem (Chu [Chu92] and Souissi et al. [SKC04]). Few references studied this criterion in a job-shop configuration. The priority rule...
متن کاملMinimizing weighted total earliness, total tardiness and setup costs
A single machine scheduling problem is described which covers earliness costs, tardiness costs and setup costs. Setups are needed whenever a switch is made to a job of another product family. All jobs within the same product family have the same processing time. Besides setup costs also setup times are involved. Idle time is allowed, preemption is not allowed. Both a mixed integer programming f...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 39 شماره 1
صفحات 105- 133
تاریخ انتشار 2020-08
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
کلمات کلیدی برای این مقاله ارائه نشده است
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023