International Natural Gas sale and Transportation Contracts and the point of contractual risk transfer upon CISG (Vienna1980)

نویسندگان

چکیده مقاله:

Determining where the risk of contractual responsibility transfers in  international sale and transportation of gas contracts is very important in these wells and parties’ of these contracts, additionally the way of distributing the risk and the point it transfers influences contractual and financial position of the contract parties’.In transportation projects that natural gas is carried by pipe lines, The parties usually determine the point of ownership, risk and goods transfer by agreement in the contracts, in case of non determining applicable law and silence of territorial rules, the Vienna Convention or INCOTERMs will probably govern on these contracts in respect of transferring of risk. In transfer projects of energy that natural gas is carried by ships,the point of risk transfer is according to agreement in the contracts or other international conventions. Vienna convention implies that risk transfers when the goods are delivered,but there are some exceptions in determining the point of risk's transfer which is an accepted solution and it is the time whene the contract is concluded.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the study of practical and theoretical foundation of credit risk and its coverage

پس از بررسی هر کدام از فاکتورهای نوع صنعت, نوع ضمانت نامه, نرخ بهره , نرخ تورم, ریسک اعتباری کشورها, کارمزد, ریکاوری, gdp, پوشش و وثیقه بر ریسک اعتباری صندوق ضمانت صادرات ایران مشخص گردید که همه فاکتورها به استثنای ریسک اعتباری کشورها و کارمزد بقیه فاکتورها رابطه معناداری با ریسک اعتباری دارند در ضمن نرخ بهره , نرخ تورم, ریکاوری, و نوع صنعت و ریسک کشورها اثر عکس روی ریسک اعتباری داردو پوشش, وثی...

15 صفحه اول

Applying Non-Contractual Methods and Quantitative Terms to Increase the Durability of Long-Term Natural Gas Sale Agreements

The success of long-term gas sales contracts is largely related to the ability of the seller and the buyer to adapt the terms of the contract to their conditions, infrastructure, facilities and market. If the buyer's demand changes from season to season and seasonally fluctuates, problems and complexities arise for the seller and he may need to provide the excess capacity to produce, refine and...

متن کامل

hazard evaluation of gas condensate stabilization and dehydration unit of parsian gas refinery using hazop procedures

شناسایی مخاطرات در واحد 400 پالایشگاه گاز پارسیان. در این پروزه با بکارگیری از تکنیک hazop به شناسا یی مخاطرات ، انحرافات ممکن و در صورت لزوم ارایه راهکارهای مناسب جهت افزایش ایمنی فرا یند پرداخته میگردد. شرایط عملیاتی مخاطره آمیز نظیر فشار و دمای بالا و وجود ترکیبات مختلف سمی و قابل انفجار در واحدهای پالایش گاز، ضرورت توجه به موارد ایمنی در این چنین واحدهایی را مشخص می سازد. مطالعه hazop یک ر...

the survey of the virtual higher education in iran and the ways of its development and improvement

این پژوهش با هدف "بررسی وضعیت موجود آموزش عالی مجازی در ایران و راههای توسعه و ارتقای آن " و با روش توصیفی-تحلیلی و پیمایشی صورت پذیرفته است. بررسی اسنادو مدارک موجود در زمینه آموزش مجازی نشان داد تعداد دانشجویان و مقاطع تحصیلی و رشته محل های دوره های الکترونیکی چندان مطلوب نبوده و از نظر کیفی نیز وضعیت شاخص خدمات آموزشی اساتید و وضعیت شبکه اینترنت در محیط آموزش مجازی نامطلوب است.

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 26  شماره None

صفحات  85- 105

تاریخ انتشار 2021-10

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

کلمات کلیدی برای این مقاله ارائه نشده است

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023