Integrated capacitated transportation and production scheduling problem in a fuzzy environment

نویسندگان

چکیده مقاله:

Nowadays, several methods in production management mainly focus on the different partners of supply chain management. In real world, the capacity of planes is limited. In addition, the recent decade has seen the rapid development of controlling the uncertainty in the production scheduling configurations along with proposing novel solution approaches. This paper proposes a new mathematical model via strong recent meta-heuristics planning. This study firstly develops and coordinates the integrated air transportation and production scheduling problem with time windows and due date time in Fuzzy environment to minimize the total cost. Since the problem is NP-hard, we use four meta-heuristics along with some new procedures and operators to solve the problem. The algorithms are divided into two groups: traditional and recent ones. Genetic Algorithm (GA) and Particle Swarm Optimization (PSO) as traditional algorithms, also Keshtel Algorithm (KA) and Virus Colony Search (VCS) as the recent ones are utilized in this study. In addition, by using Taguchi experimental design, the algorithm parameters are tuned. Besides, to study the behavior of the algorithms, different problem sizes are generated and the results are compared and discussed.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Grey Transportation Problem in Fuzzy Environment

In classical transport models, it is always assumed that parameters such as the distance from each supply node to each demand node or the cost of transferring goods from one node to another, as well as quantities such as supply and demand are definite and definite amounts. But in real matters, considering these assumptions is not logical. On the other hand, there may be a real problem in mathem...

متن کامل

Integrated scheduling of production and rail transportation

Article history: Received 9 September 2013 Received in revised form 14 February 2014 Accepted 24 May 2014 Available online 9 June 2014

متن کامل

Integrated modeling and solving the resource allocation problem and task scheduling in the cloud computing environment

Cloud computing is considered to be a new service provider technology for users and businesses. However, the cloud environment is facing a number of challenges. Resource allocation in a way that is optimum for users and cloud providers is difficult because of lack of data sharing between them. On the other hand, job scheduling is a basic issue and at the same time a big challenge in reaching hi...

متن کامل

Fuzzy Multi-Objective Capacitated Transportation Problem with Mixed Constraints

In this article a capacitated transportation problem is considered which is formulated as a multi objective capacitated transportation problem with mixed constraints. To determine the optimum compromise solution of multi objective capacitated transportation problem (MOCTP) with mixed constraints a Fuzzy multi objective programming approach has been applied in which we use three different forms ...

متن کامل

The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan

T integrated production and transportation scheduling problem (PTSP) with capacity constraints is common in many industries. An optimal solution to PTSP requires one to simultaneously solve the production scheduling and the transportation routing problems, which requires excessive computational time, even for relatively small problems. In this study, we consider a variation of PTSP that involve...

متن کامل

Integrated Production and Transportation Scheduling in Supply Chain Optimisation

In this chapter, an integrated production and transportation scheduling model is proposed. This model is based on multi-item capacitated lot sizing and facility location type models. The objective of the integrated model is to minimize the total production and transportation cost. The integrated model is solved by Lagrangian decomposition method and the decomposed two sub-problems can be solved...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 29  شماره 2

صفحات  197- 211

تاریخ انتشار 2018-06

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023