Identifying the change time of multivariate binomial processes for step changes and drifts

نویسندگان

  • Majid Khedmati Department of Industrial Engineering, Sharif University of Technology, P.O. Box 11155–9414, Azaadi Ave., Tehran, 1458889694, Iran
  • Seyed Taghi Akhavan Niaki Department of Industrial Engineering, Sharif University of Technology, P.O. Box 11155–9414, Azaadi Ave., Tehran, 1458889694, Iran
چکیده مقاله:

In this paper, a new control chart to monitor multi-binomial processes is first proposed based on a transformation method. Then, the maximum likelihood estimators of change points designed for both step changes and linear-trend disturbances are derived. At the end, the performances of the proposed change-point estimators are evaluated and are compared using some Monte Carlo simulation experiments, considering that the real change type presented in a process are of either a step change or a linear-trend disturbance. According to the results obtained, the change-point estimator designed for step changes outperforms the change-point estimator designed for linear-trend disturbances, when the real change type is a step change. In contrast, the change-point estimator designed for linear-trend disturbances outperforms the change-point estimator designed for step changes, when the real change type is a linear-trend disturbance.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identifying the time of a step change in AR(1) auto-correlated simple linear profiles

Assuming a first-order auto-regressive model for the auto-correlation structure between observations, in this paper, a transformation method is first employed to eliminate the effect of auto-correlation. Then, a maximum likelihood estimator (MLE) of a step change in the parameters of the transformed model is derived and three separate EWMA control charts are used to monitor the parameters of th...

متن کامل

Identifying the Time of Step Change in the Mean of Autocorrelated Processes

Control charts are used to detect changes in a process. Once a change is detected, knowledge of the change point would simplify the search for and identification of the special cause. Consequently, having an estimate of the process change point following a control chart signal would be useful to process analysts. Change point methods for the uncorrelated process have been studied extensively in...

متن کامل

the application of multivariate probit models for conditional claim-types (the case study of iranian car insurance industry)

هدف اصلی نرخ گذاری بیمه ای تعیین نرخ عادلانه و منطقی از دیدگاه بیمه گر و بیمه گذار است. تعین نرخ یکی از مهم ترین مسایلی است که شرکتهای بیمه با آن روبرو هستند، زیرا تعیین نرخ اصلی ترین عامل در رقابت بین شرکتها است. برای تعیین حق بیمه ابتدا می باید مقدار مورد انتظار ادعای خسارت برای هر قرارداد بیمه را برآورد کرد. روش عمومی مدل سازی خسارتهای عملیاتی در نظر گرفتن تواتر و شدت خسارتها می باشد. اگر شر...

15 صفحه اول

A Novel Clustering Approach for Estimating the Time of Step Changes in Shewhart Control Charts

  Although control charts are very common to monitoring process changes, they usually do not indicate the real time of the changes. Identifying the real time of the process changes is known as change-point estimation problem. There are a number of change point models in the literature however most of the existing approaches are dedicated to normal processes. In this paper we propose a novel app...

متن کامل

a synchronic and diachronic approach to the change route of address terms in the two recent centuries of persian language

terms of address as an important linguistics items provide valuable information about the interlocutors, their relationship and their circumstances. this study was done to investigate the change route of persian address terms in the two recent centuries including three historical periods of qajar, pahlavi and after the islamic revolution. data were extracted from a corpus consisting 24 novels w...

15 صفحه اول

the effects of time planning and task complexity on accuracy of narrative task performance

هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 9  شماره 1

صفحات  -

تاریخ انتشار 2013-12-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023