Effective Factors on Rural People’s Non-Participation of Mahabad’s Dam Catchment in Watershed Management Projects
نویسندگان
چکیده مقاله:
The purpose of this descriptive-correlation study was to investigate effective factors on rural people’s non-participation of Mahabad’s dam catchment in Watershed Management Projects. The research instrument was structural questionnaire with close-ended questions, which its validity confirmed by panel of academic staff and reliability of questionnaire was confirmed. The target population of this study consisted of all householders who lived in Mahabad’s dam catchment (N=2458) out of them, according to Cochran's formula 175 people were selected by using cluster sampling in a simple randomization method (n=175). The descriptive results showed lack of financial ability for participating in watershed management, lack of awareness about watershed management efficiency, the long term rate of return on the investment attracted in watershed management were the main variables related to rural people’s non participation in watershed management. By applying Factor Analysis Explanatory Technique, effective factors on rural people’s non-participation in watershed management were reduced to five factors namely weakness of agricultural extension services, getting watershed management out of governmental control, no achieving success to implement another rural projects by government, and no considering local individuals or organization by government. These five factors expressed 84% of the total variance of the non-participation people on Mahabad’s dam catchment in watershed management projects. Therefore points to these factors could solve the barriers of non-participation people on Mahabad’s dam catchment in watershed management projects.
منابع مشابه
effective factors on rural people’s non-participation of mahabad’s dam catchment in watershed management projects
the purpose of this descriptive-correlation study was to investigate effective factors on rural people’s non-participation of mahabad’s dam catchment in watershed management projects. the research instrument was structural questionnaire with close-ended questions, which its validity confirmed by panel of academic staff and reliability of questionnaire was confirmed. the target population of thi...
متن کاملAnalyzing effective factors on rural participation in watershed management activities (Case study: Cheshmeh Zainal Broujen)
Broujen township is located at an area of 2755 square kilometers(16 percent of the area of Chaharmahal and Bakhtiari province) 65 kilometers from the province center(Shahrekord). In 2016, this township had 122483 inhabitants in the form of 36,238 households. In recent years, various watershed management activities have been implemented at the provincial level or planned for implementation i...
متن کاملFactors Affecting Stakeholders Non-Participation in Rangeland Management Projects
The purpose of this research was analyzing factors affecting non-participation of stakeholders in rangeland management projects. The research method was descriptive-correlative design in ranches of Piranshahr rangelands in western Azerbaijan province, Iran. All ranches that studied (Zioke Yurd, Ziuke Mirgah Chaku, Khargedashan Yurd and Gardeh Bon), are utilized in common use manner. Simple rand...
متن کاملInvestigating and prioritizing factors affecting the non-participation of rural societies in watershed management projects (Case study: Asadli watershed, North Khorasan Provience)
Effective and less expensive implementation of plans, protection of projects, and future restoration of structures require the participation of stakeholders in all stages of study, implementation, monitoring, evaluation, and maintenance. Therefore, identifying and classifying indicators and sub-indices that affect people's participation and promoting them in the implementation of watershed and ...
متن کاملeffective factors on rural people participation in watershed management projects (case study: dorod faraman & lalabad basin, kermanshah province)
the purpose of this descriptive-correlation study was to investigate effective factors on rural people participation in watershed management projects in dorod faraman & lalabad basin, kermanshah province. both qualitative and quantitative paradigms were considered in the study. the target population in quantitative section consisted all rural peoples in the dorod faraman & lalabad basin village...
متن کاملIdentification and Prioritization of Effective Factors on Preventing Participation of Rural Societies in watershed Management Plans Case Study (Niarij Watershed of Qazvin Province)
Peoples’ participation in watershed development projects, in addition to reducing operating costs, can lead to more effective project implementation. Various factors causes the lack of public participation in watershed development projects. The purpose of this study was to identify, classify and prioritize these factors based on local people as well as experts viewpoints in Niarij watershed of ...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 5 شماره 1
صفحات 19- 26
تاریخ انتشار 2015-03-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023